Screen Room Installation Instructions---Not Use
Screen Room Installation Instructions| STEP-BY-STEP SCREEN ROOM INSTALLATION INSTRUCTIONS |
 | Suggested Tools
- 3' level
- Tape measure
- Metal Snips
- Spline roller
- Chalk line
- Hack saw or shop saw (finish blade)
- 3/8" var. speed drill
- 3/16" drill bits
- 1/4" masanary bit
- Chaulk gun
- 1/4" magnetic socket
- Ladder
- Utility knife
|

| SCREEN ROOM CONSTRUCTION | - Base channel is attached to floor with drive pins.
- Top channel is secured to roof framing members.
- Uprights are screwed to top and bottom channel.
- Horizontal screen receiving channels are installed between posts.
- Kick plates are cut and installed.
- Screen is rolled in to channels and uprights.
- Door is installed.
Do It Yourself Kits are available, E-Mail us your requirements. |
| EXTRUDED SCREEN ROOM PARTS |
|
| Note: this page is being updated.. more detailed information will be posted soon. |
|