 |
 |
 |
This is the Cee shaped attaching beam; yours
may or may not have the thermal break. |
Pre drilling for the attaching screws, lay
the holes out to hit the rafter tails or studs. 16" O.C. Is best. |
This shows the Cee channel installed on the
home's fascia. Check for level. |
 |
 |
 |
Side veiw of the attaching channel. |
Chalking as a leak precaution. |
Chalking |
 |
 |
 |
This job has a post used as a set back beam,
and the beam is being cut to length. |
Measuring the post to be cut to length and
the installer is holding a speed square prior to making his cut. |
A specal bracket for joining the post and
beam is being layed out. |
 |
 |
 |
This customer wanted her post set in a few
inches from the ends. The bracket is being attached with self tapping
Tec screws |
Post being attached to the beam. Speed sqaure
will assure plumb conditions. |
Re-checking for square as he goes. |
 |
 |
 |
Checking for plumb prior to securing foot
brackets. |
Bracket in place prior to drilling for fastners. |
First fastener in, one of four, through bold
is in place. |
 |
 |
 |
Roof panel being placed. |
Panel shown in the receiving channel |
End view showing post, beam, and roof panels,
on more panel to go. |
 |
 |
 |
Last roof panel being cut down to fit. |
Front drip fascia installed, side fascia not
on jet. |
Screws being filled in at attaching point
by home owner. |
 |
 |
 |
Roof front drip edge being fastened from the
top as it could not be done from a ladder do to height |
Side fascia being screwed in place. |
Screws being applied to the top of panels
at the Cee shaped attaching channel. |
 |
 |
 |
Self tapping 3.5" screw assembly for
attaching roof panels down to the set back beam. |
Close up of roof pannel at house wall. |
From the top. |
 |
 |
 |
A happy customer, every job is unique as was
this one. |
From the front; No center post because of
the excellent view of a lake. |
Side view of cover. The end of the beam was
capped with 1.5" x 1.5" angle pieces. |
|
|
|